Blue epoxy warehouse floor between racking installed by Liberty Epoxy
Warehouse & Industrial · Philadelphia

Warehouse floors built for forklift traffic, aisle after aisle.

An uncoated slab gives off dust, soaks up oil, and breaks down at the joints. We put down a high-build 100% solids epoxy, 20 mils and up depending on the traffic, with the number written on your quote. Work runs aisle by aisle, so your racks stay loaded and your trucks keep moving.

5.0 on Google Licensed PA HIC #128520 · Insured COI on Request

Request a Free Project Estimate Call (267) 225-3989

What the coating fixes

A sealed floor pays for itself in uptime.

Distribution warehouses, manufacturing plants, fleet garages, loading docks, and flex space across greater Philadelphia.

  • Stops concrete dusting, the hidden cost that coats product, racking, and HVAC filters
  • Takes pneumatic forklift traffic all day; where you run steel wheels we spec a heavier build or urethane cement for those bays
  • Line striping, safety zones, and aisle marking built into the spec, not painted over it later
  • A light-reflective floor brightens the whole building and cuts lighting load
  • Diamond grinding prep so the system bonds to the slab, with joint and crack repair before coating
  • Phased aisle-by-aisle installs, nights and weekends included; the operation keeps running
Coated floor down an auto service shop between yellow columns
Our installs

Industrial floors on the job.

Solid color epoxy floor in a warehouse dock bay
Warehouse dock bay, solid color epoxy
Quartz broadcast floor in a wet-area bay
Wet-area bay, quartz broadcast
Drag the handle

Before and after.

Distribution warehouse floor after epoxy coating Distribution warehouse floor before coating BeforeAfter

Distribution warehouse, blue solid color

Auto service shop floor after coating Same auto service shop floor before coating, bare concrete BeforeAfter

Auto service shop floor

Straight answers

What warehouse managers ask first.

Do we have to empty the warehouse?
No. We coat in phases, aisle by aisle or bay by bay. Racking stays loaded outside the active section, and traffic lanes reopen as sections cure. Most installs run nights and weekends around your shifts.
How soon can forklifts drive on the new floor?
Foot traffic typically comes back first, wheel traffic after full cure, and the timing depends on the system and site conditions. A polyaspartic topcoat shortens the window when the schedule is tight. You get the return-to-service times in writing before we start.
Do you do line striping and safety marking?
Yes. Aisle lines, pedestrian walkways, dock zones, and hazard marking go down as part of the floor system, sealed under the topcoat instead of painted on top to wear away.

Tell us your hours. We’ll work around them.

Walkthrough, spec, and written estimate at no charge.

Request a Free Project Estimate Call (267) 225-3989

5.0 on Google, every review five stars · Licensed PA HIC #128520 · Est. 1964

Project estimate request form

Request a Free Project Estimate

SAME-DAY REPLY

Tell us about the facility. We reply the same day, walk the space, and put one written number on it. Prefer the phone? Call (267) 225-3989.

Same-day reply · COI on request · Your info stays private

Call Now Request Estimate