Warehouse floors built for forklift traffic, aisle after aisle.
An uncoated slab gives off dust, soaks up oil, and breaks down at the joints. We put down a high-build 100% solids epoxy, 20 mils and up depending on the traffic, with the number written on your quote. Work runs aisle by aisle, so your racks stay loaded and your trucks keep moving.
★★★★★ 5.0 on GoogleLicensed PA HIC #128520 · InsuredCOI on Request
Distribution warehouses, manufacturing plants, fleet garages, loading docks, and flex space across greater Philadelphia.
Stops concrete dusting, the hidden cost that coats product, racking, and HVAC filters
Takes pneumatic forklift traffic all day; where you run steel wheels we spec a heavier build or urethane cement for those bays
Line striping, safety zones, and aisle marking built into the spec, not painted over it later
A light-reflective floor brightens the whole building and cuts lighting load
Diamond grinding prep so the system bonds to the slab, with joint and crack repair before coating
Phased aisle-by-aisle installs, nights and weekends included; the operation keeps running
Our installs
Industrial floors on the job.
Warehouse dock bay, solid color epoxyWet-area bay, quartz broadcast
Drag the handle
Before and after.
BeforeAfter
Distribution warehouse, blue solid color
BeforeAfter
Auto service shop floor
Straight answers
What warehouse managers ask first.
Do we have to empty the warehouse?
No. We coat in phases, aisle by aisle or bay by bay. Racking stays loaded outside the active section, and traffic lanes reopen as sections cure. Most installs run nights and weekends around your shifts.
How soon can forklifts drive on the new floor?
Foot traffic typically comes back first, wheel traffic after full cure, and the timing depends on the system and site conditions. A polyaspartic topcoat shortens the window when the schedule is tight. You get the return-to-service times in writing before we start.
Do you do line striping and safety marking?
Yes. Aisle lines, pedestrian walkways, dock zones, and hazard marking go down as part of the floor system, sealed under the topcoat instead of painted on top to wear away.