ESD flooring for King of Prussia labs and electronics facilities
Grounded ESD floors for King of Prussia labs, cleanrooms, and electronics rooms. We can work one room at a time so the rest of the building stays open.
★★★★★ 5.0 on GoogleLicensed PA HIC #128520 · InsuredCOI on Request
For biotech labs and cleanrooms in King of Prussia, the floor is a full grounded system. After we prepare the concrete, we install copper tape tied to the building’s ground, a conductive primer, and a static dissipative topcoat chosen for your specification.
What we coat
ESD floors we install around King of Prussia
Biotech and device labs off Renaissance Boulevard
Electronics assembly in the business park
Test and burn-in rooms
Server and data rooms
Cleanroom corridors and gowning areas
Repair benches in Henderson Road flex space
Our installs
Seamless industrial floors on the job.
Corporate headquarters, solid color epoxyDark solid color epoxy floor with a high gloss in a bright open room
Tell us your hours. We’ll work around them.
We walk the room and give you a written estimate at no charge.
5.0 on Google, every review five stars · Licensed PA HIC #128520 · Est. 1964
Project estimate request form
Straight answers
ESD flooring in King of Prussia, in plain terms.
Is an ESD epoxy floor the same as anti-static tile in a King of Prussia lab?
No. ESD epoxy forms a seamless grounded system over prepared concrete, while tile has joints between pieces. Your team checks the finished epoxy floor with its own meter and follows the testing schedule in your ESD program.
Can you install ESD flooring over our existing lab floor?
No. We remove the existing flooring first. At the walkthrough we look at the floor, then we remove tile, adhesive, or failed coatings as needed and diamond grind the concrete.
How long is a King of Prussia lab out of service for an ESD floor?
The room stays closed through prep, coating, and curing. We plan that schedule with you, can work nights, weekends, or one room at a time, and give you reopening times before we start.
What do we need to send you to get an ESD floor quoted?
Send the square footage, photos, the rooms involved, and the ESD standard you need to meet, plus the hours we can work. We reply the same day, set up a walkthrough, and give you one written estimate.