Commercial epoxy flooring for Horsham and Warminster shop floors
Electronics rooms, machine shops, and loading docks in Horsham and Warminster, with ESD floors where your work needs them. We schedule around production.
★★★★★ 5.0 on GoogleLicensed PA HIC #128520 · InsuredCOI on Request
Horsham and Warminster & Montgomery and Bucks Counties
Floors for electronics shops and production areas.
Assembly and test rooms get static dissipative floors. Machine rooms and docks get thicker solid color or quartz coatings. Our crew has worked at an Army installation, a Navy yard, and a Federal Reserve building, so we’re used to badges, escorts, and restricted hours.
What we coat
Horsham and Warminster floors we coat
Electronics assembly and test rooms
Defense and avionics supplier shops
Precision machine shops off Jacksonville Road
Lab and pharma space on campus
Receiving docks and parts warehouses
Calibration and metrology rooms
Our installs
Seamless industrial floors on the job.
Red flake epoxy corridor in an industrial facilityFacility corridor, grey quartz broadcast
Tell us your hours. We’ll work around them.
We see the shop first, then send a written estimate at no charge.
5.0 on Google, every review five stars · Licensed PA HIC #128520 · Est. 1964
Project estimate request form
Straight answers
Commercial floors in Horsham and Warminster, in plain terms.
Does an electronics shop in Horsham need ESD flooring or will standard epoxy do?
No. Standard epoxy doesn’t give you the static control of an ESD floor. For sensitive electronics, send us the ESD standard you have to meet. We can install a grounded system in assembly areas and standard epoxy everywhere else.
Our defense contract requires escorts and restricted hours. Can you work that way?
Yes. Before we start, we plan escorted access, badges, and restricted hours with you.
Coolant and chips are eating our machine shop floor in Warminster. What system is right for that?
A thicker solid color epoxy or quartz system usually suits a machine shop floor. We pick the coating for your oils, coolants, and wheel traffic, with urethane cement where the work calls for it.
How long before we can move equipment back into a coated room?
Before we start, we give you return-to-service times for foot traffic, carts, and machinery. They depend on the coating and room temperature. We can work in sections so you get one area back while another cures.