Grounded ESD floors for pharmaceutical, medical device, and electronics facilities in Malvern. We schedule the install around your production calendar.
★★★★★ 5.0 on GoogleLicensed PA HIC #128520 · InsuredCOI on Request
We install static dissipative floors for labs and electronics production in Great Valley Corporate Center and around Malvern. The system starts with copper tape tied into the building’s ground. A conductive primer goes over it, then a topcoat picked for the resistance range in your specification.
What we coat
Malvern and Great Valley rooms we install ESD floors in
Pharma pilot plants and packaging rooms
Medical device assembly lines
Diagnostic and instrument labs
Electronics and sensor manufacturing
Cleanroom gowning and corridors
Smaller flex shops around Malvern
Our installs
Seamless industrial floors on the job.
Corporate headquarters, solid colorEquipment room, solid color epoxy
Tell us your hours. We’ll work around them.
We reply the same day and give your team a written estimate at no charge.
5.0 on Google, every review five stars · Licensed PA HIC #128520 · Est. 1964
Project estimate request form
Straight answers
ESD flooring in Malvern, in plain terms.
Can an ESD floor go into a validated pharma room in Great Valley without a long shutdown?
We plan the install inside your scheduled work window. Prep, coating, and curing all have to fit in it, and we give your quality team the planned dates and cure times before we start.
Does ESD epoxy survive the cleaning and sanitizing chemicals a pharma floor sees?
We select the coating after reviewing your cleaning and sanitizing products. Send the chemical list with your flooring requirements. Your team verifies the finished floor's electrical resistance with its own meter.
Is diamond grinding enough prep for an ESD floor on a large open floor?
Diamond grinding is our standard prep. On a large open floor, we may use shot blasting to prepare the concrete for the primer. Your written quote states the method.
What does an ESD floor cost per square foot in Malvern?
We give you a written price after we see the floor. The concrete condition, grounding layout, square footage, and working hours all affect it. Send photos and your ESD requirements to set up a walkthrough.