Washdown floors from Packer Avenue to Columbus Boulevard.
We install floors in South Philadelphia’s produce houses, cold storage buildings, and kitchens. Wet and cold rooms get urethane cement, and dry storage gets solid color epoxy. We pick each system for your cleaning routine, and our third-generation family crew works around your loading schedule.
What we coat
South Philadelphia floors we coat
Produce and seafood distribution floors
Cold storage and walk-in freezers
Commissary and catering kitchens
Restaurant lines along Passyunk Avenue
Port warehouses off Columbus Boulevard
Bakery and food production rooms
Our installs
Seamless industrial floors on the job.
Walk-in refrigerator, urethane cementFood production room, urethane cement with cove base
Tell us your hours. We’ll work around them.
We come out, look at the rooms, and send a written estimate at no charge.
5.0 on Google, every review five stars · Licensed PA HIC #128520 · Est. 1964
Project estimate request form
Straight answers
Commercial floors in South Philadelphia, in plain terms.
What floor survives a South Philly seafood or produce distributor's washdown?
Urethane cement. It can suit rooms with hot washing, brine, or cold storage. We pick the formulation for your cleaning chemicals and temperatures and can carry the coating up the wall at the edges.
Can you redo our walk-in freezer floor without thawing it out for a week?
Possibly. Some urethane cement formulations cure at low temperatures. Tell us the room temperatures and the hours you can give us, and we’ll plan the work in sections where we can. We explain the downtime at the walkthrough.
Will the new floor pass a health inspection in a Philadelphia commissary?
We review your inspector’s or architect’s written requirements before we quote. We install seamless epoxy and urethane cement floors, with curved edges up the walls and non-slip texture suited to the area.
Can you coat a restaurant kitchen on Passyunk between close and open?
Sometimes. The available hours must allow for preparation, coating, and curing. We review your overnight schedule first and can also plan work for a closed day or in sections. You receive the schedule before installation.